PREFERRED EQUIPMENT RESOURCE

Location: Johnston, RI
System Size: 263 kW DC
Installation Type: Rooftop Solar
Installation Year: 2021
Est. Lifetime CO2 Reduced: 4,000 tons

Ecogy Preferred is a 263 kWdc rooftop solar project hosted at a local equipment warehouse in Johnston, RI. The renewable energy is sold directly to the Rhode Island RI RE Growth Program. Significant planning and reachout with the Woonasquatucket River Watershed Council (WRWC) made this project a win-win for both local environmental activists, the town of Johnston, and Preferred Equipment Resource.